From flow panels to tanks and process piping, BWM worked to expand a food manufacturer in Modesto, CA. The unique challenge of the project was incorporating additional equipment into the existing plant, with minimal down time for production. Process piping was planned, welded, and installed on site for each new piece of equipment as it was integrated into their workflow. A 30,000 gallon palm oil tank was also fabricated at BWM's fab shop and installed and insulated on site. 

This expansive project included:

  • Setting equipment
  • Designing process piping layout to incorporate with exisitng lines
  • Welding process piping 
  • Fabricating and installing a 30,000 gallon palm oil tank
  • Fabricating and installing custom flow panels 
  • Designing, Fabricating and installing stairs and platforms as needed


Contact Us to get a quote on your next project.

Click to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlarge
Click to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlargeClick to enlarge
Smart Gallery by publicidad en internet